Fire and Rescue departments require precise management of inspections, equipment, and community outreach. This interactive template demonstrates how command staff and administrators can streamline building inspections, track vital apparatus maintenance, and manage public education events within a centralized environment. From pre-plan data to supply requisitions, experience a customized solution built for modern emergency services administration.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Inquiries
Track public requests, station tours, and smoke detector installs. Facilities
Manage commercial buildings and target hazard occupancies. Personnel
Organize firefighters, inspectors, and property contacts. Requisitions
Pipeline tracking for equipment procurement and grants. Programs
Monitor CPR classes and community risk reduction events. Inspections
Centralize fire code enforcement and compliance checks. Apparatus
Manage fleet vehicles, ladders, and engine maintenance. Pre-Plans
Store tactical building diagrams and hazard data.Inquiry
Sarah Jenkins
New
Reviewing
Scheduled
Completed
Closed/Denied
Details
Notes
Files
Primary Request Information
NameSarah Jenkins✎
OrganizationLincoln Elementary✎
Title2nd Grade Teacher✎
Phone(555) 123-4567✎
StatusNew✎
Inquiry OwnerCaptain Miller✎
SourceWeb Form✎
Request TypeStation Tour✎
Group Size25✎
Preferred DateOct 15, 2026✎
Assigned StationStation 42✎
Logistics & Details
Address123 School Ln✎
City/DistrictNorth District✎
Age Group7-8 Years Old✎
Accessibility NeedsYes✎
Apparatus RequestedEngine Only✎
Public Ed MaterialsHelmets & Stickers✎
Liability Waiver SignedPending✎
Prior InteractionYes✎
Battalion Chief ApprovalNot Required✎
Notes/Special RequestsOne student uses a wheelchair.✎
Initial Review
Received request for 2nd grade tour. Station 42 is best suited. Need to confirm Engine 42 will be in quarters.
Accessibility Check
Confirmed with the teacher that the apparatus bay at Station 42 is fully accessible for the student in the wheelchair.
Swag Bag Prep
Requested 25 plastic fire helmets and sticker badges from supply.
Facility (Account)
Apex Chemical Plant
Details
Personnel
Requisitions/Permits
Inspections
Apparatus Assig.
Pre-Plans
Notes
Files
Building Information
Facility NameApex Chemical Plant✎
Main Phone(555) 555-0200✎
Address400 Industrial Way✎
Occupancy TypeIndustrial (F-1)✎
Facility OwnerFire Marshal Davis✎
Hazard LevelTarget Hazard✎
First Due StationStation 11✎
Square Footage150,000 sq ft✎
Systems & Compliance
Sprinkler SystemFully Sprinklered✎
Fire Alarm PanelAddressable (Main Lobby)✎
Knox Box LocationMain Entrance Gate✎
Last Inspection DateFeb 10, 2026✎
Compliance StatusPassed - Compliant✎
Tier II Chemical ReportOn File (Current)✎
Tier II Update Received
Safety Coordinator submitted the updated chemical inventory. Added 200 gallons of corrosive material to Sector 4. Updated pre-plan accordingly.
Knox Box Update
Main gate locks changed. Security provided the new master keys. Knox box updated on Engine 11 and Battalion 2.
Annual Walkthrough
Conducted company walk-through with B-Shift to familiarize new personnel with the tank farm layout.
Personnel
Captain Miller
Details
Notes
Files
Personnel Information
Contact OwnerChief Boden✎
Contact TypeDepartment Personnel✎
Shift AssignmentB-Shift✎
Primary ApparatusEngine 11✎
Certifications & Data
Phone (Station)(555) 111-2222✎
Phone (Cell/Radio)(555) 999-8888✎
Radio Call SignEngine 11 Captain✎
EMS LevelParamedic✎
HazMat LevelTechnician✎
StatusActive Duty✎
Promotion to Captain
Promoted from Lieutenant and transferred to Station 11, B-Shift to take over Engine 11.
Paramedic Recertification
Completed required 48 hours of continuing education. State license renewed through 2028.
Commendation
Received unit citation for the rescue at the Riverside Towers high-rise fire.
Requisition
Bunker Gear Replacement - St 11
Draft/Needs ID
Quote Requested
Approval Routing
Approved / PO Issued
Closed Received
Details
Line Items
Notes
Files
Request Information
Request NameBunker Gear Replacement✎
Amount$15,000✎
Target Need DateOct 01, 2026✎
StageApproval Routing✎
Funding StatusBudgeted✎
Request OwnerCaptain Miller✎
Request TypePPE / Gear✎
Station / UnitStation 11✎
JustificationEnd of Life (10 Years)✎
NFPA CompliantYes✎
Approval Level Req.Battalion Chief✎
Procurement Details
Quote NumberQT-88912✎
PO NumberPending✎
Budget CodeGL-44-PPE-11✎
Grant FundedNo✎
Grant ID ReferenceN/A✎
Sole Source ProviderNo (State Contract)✎
Bids Received3✎
Est. Delivery Time6-8 Weeks✎
Receiving LocationQuartermaster/HQ✎
Asset Tagging Req.Yes✎
Sizing Scheduled
Vendor rep came to Station 11 on B-Shift to measure the 5 personnel due for replacement gear.
Budget Verification
Confirmed funds are available in the Q3 PPE replacement budget line. Moving to BC for sign-off.
Quote Received
Received final quote from Lion including custom sizing adjustments. Total is exactly $15k.
Program / Event
Fire Prevention Week 2026
Details
Event Roster
Notes
Files
Program Details
Program NameFire Prevention Week 2026✎
TypeEvent✎
StatusIn Progress✎
Target AudienceGeneral Public✎
Program OwnerPublic Ed Office✎
Primary ThemeCooking Safety✎
Location/VenueAll Fire Stations✎
Scheduling & Metrics
Start DateOct 04, 2026✎
End DateOct 10, 2026✎
Personnel Req.On-Duty Crews✎
Apparatus OOS Req.No (In Service)✎
Budget Allocation$5,000✎
Expected Attendance2,500✎
Actual AttendancePending✎
Media InvolvementPress Release Sent✎
Open House Schedule
All stations will hold open houses on Saturday, Oct 10th from 10am to 2pm. Ensure all bays are clean.
Media Briefing
Chief Boden will do a live spot with Channel 5 Morning News on Monday the 4th to kick off the week.
Swag Distribution
Pallets of NFPA cooking safety pamphlets and plastic helmets delivered to all battalion HQs for distribution to stations.
Inspection
INSP-26-089 (Apex Chemical)
Requested/Due
Scheduled
In Progress
Reviewing Findings
Closed
Details
Notes
Files
Inspection Basics
Inspection IDINSP-26-089✎
Date ScheduledSep 21, 2026✎
Time09:00 AM✎
StatusScheduled✎
ResultPending✎
Inspection TypePermit / Hot Work✎
Accompanying PersonnelEngine 11 Crew✎
Notice ProvidedYes✎
Evaluation & Findings
Violations Found0 (Pending)✎
Life Safety HazardPending✎
Re-inspection RequiredTBD✎
Fee Assessed$0.00✎
Citation IssuedNo✎
Egress / ExitsPending✎
ExtinguishersPending✎
Sprinkler SystemPending✎
Alarm SystemPending✎
HazMat StoragePending✎
Pre-Inspection Briefing
Met with Engine 11 crew. We will be checking the hot work permit conditions for the welding taking place near Tank 3.
Scheduling Confirmation
Lucius Fox confirmed they will have the welding supervisor present for the inspection on Monday at 0900.
Inspection Triggered
Inspection generated automatically from Hot Work Permit application submission.
Apparatus
Engine 11 (2020 Pierce Enforcer)
Procurement/Build
In Service (Frontline)
In Service (Reserve)
Out of Service
Decommissioned/Sold
Details
Notes
Files
Vehicle Specifications
Unit ID/Call SignEngine 11✎
TypePumper✎
Year/Make/Model2020 Pierce Enforcer✎
VIN1P9A8B7C6D5E4F3G2✎
StatusIn Service✎
Fleet ID (Shop #)E-20-01✎
Fleet ManagerFleet Maintenance✎
Assigned StationStation 11✎
Mileage45,210✎
Engine Hours3,850✎
Pump Capacity1500 GPM✎
Maintenance & Testing
Tank Size (Water)750 Gallons✎
Tank Size (Foam)30 Gallons Class A✎
Last PM ServiceMay 15, 2026✎
Next PM DueNov 15, 2026✎
Last Annual Pump TestMar 01, 2026✎
Pump Test ResultPassed✎
Last Hose TestApr 10, 2026✎
Last Ladder TestN/A (Ground Ladders Only)✎
Defect/Repair NotesSlight tear in driver side seat. Minor dent rear bumper.✎
Replacement Year2030✎
Tire Replacement Complete
All rear dual tires replaced. Alignment checked. Unit returned to service.
PM Service Update
Routine 500-hour engine service completed. Oil, filters, and fluids changed. No major issues noted.
Annual Pump Test
Drafted at the training tower. Pump held 1500 GPM at 150 PSI with no drops in pressure. Passed perfectly.
Pre-Plan
PP-APEX-01: Main Facility Tactical Plan
Draft
Site Visit Completed
Reviewing
Active (Published)
Archived
Details
Notes
Files/Diagrams
Pre-Plan Information
Plan IDPP-APEX-01✎
DescriptionMain Facility Tactical Plan✎
StatusActive (Published)✎
Hazard LevelTarget Hazard✎
First Due StationStation 11✎
Plan OwnerCaptain Miller✎
Last Updated DateJan 05, 2026✎
Next Review DateJan 05, 2027✎
Construction TypeType II (Non-Combustible)✎
Roof TypeFlat Built-Up✎
BasementNo✎
Tactical Data
FDC LocationA/D Corner (Front Right)✎
Primary Hydrant50ft West of Entrance✎
Knox Box LocationMain Entrance Gate✎
Fire Alarm PanelMain Lobby Desk✎
Electrical ShutoffSide C (Rear) Exterior✎
Gas ShutoffSide C (Rear) Exterior✎
Sprinkler ShutoffRiser Room (Side D)✎
Special HazardsCorrosive Storage Sector 4✎
MDT SyncedYes✎
MDT Synchronization
Pushed updated plan to all Mobile Data Terminals in the first and second due apparatus. Verified on Engine 11's toughbook.
Annual Update Completed
Met with facility safety coordinator. Only change was the addition of the new corrosive storage tank in Sector 4. Diagram updated.
Water Supply Note
Hydrant closest to FDC has a lower flow rate than the main on Industrial Way. First arriving engine should lay a supply line from the street if heavy fire is showing.


